| Research on the influencing factors on nitrification performance during the long-term operation in membrane aerated biofilm reactor |
|
Authors: CHEN Yasong1, CHENG Gang2, LIU Mengmeng1, SUN Wan1, WANYAN Deqing2, LIU Jiayin2, ZHANG Congcong2, QIU Yong2, HUANG Xia2 |
|
Units: 1. National Engineering Research Center of Eco-Environment in the Yangtze River Economic Belt, China Three Gorges Corporation, Wuhan 430014, China; 2. School of Environment, Tsinghua University, Beijing 100084,China |
| KeyWords: membrane aerated biofilm reactor;long-term operation; ammonia nitrogen removal load; intermittent aeration; gas supply mode |
| ClassificationCode:TQ028; X703 |
| year,volume(issue):pagination: 2026, 46(4):150-156 |
|
Abstract: |
|
To investigate the long-term nitrification performance of membrane aerated biofilm reactor (MABR) in municipal wastewater treatment, a MABR system was constructed by employing surface-modified hollow fiber membranes as the membrane modules. The effects of various operational parameters - flushing mode, hydraulic retention time (HRT), membrane pressure, influent chemical oxygen demand (COD) concentration, and gas supply modes-on the ammonia nitrogen removal performance were systematically evaluated in the MABR system. The results indicated that hydraulic circulation flushing led to an increased biofilm density, which led to a reduced ammonia nitrogen removal efficiency in the long-term operation. In contrast, intermittent aeration proved to be more effective in enhancing and sustaining ammonia nitrogen removal load. Different HRT within the range of 2.8 to 5 hours had negligible impact on ammonia nitrogen removal performance. Periodic fluctuations in membrane pressure between 0 and 20 kPa promoted biofilm detachment and maintained a thinner state, thereby improving ammonia nitrogen removal; however, operating in longer term led to insufficient biomass accumulation, ultimately compromising treatment efficiency. Higher influent COD concentrations were found to inhibit ammonia nitrogen removal. Furthermore, during long-term operation, the series-connected membrane module achieved significantly higher ammonia nitrogen removal than that of parallel-connected membrane module. |
|
Funds: |
|
中国长江三峡集团公司科研项目资助(NBWL202300013) |
|
AuthorIntro: |
| 陈亚松(1982-),男,湖北黄石人,博士,正高级工程师,研究方向为水环境系统治理;程刚(1993-),男,湖北咸宁人,硕士,研究方向为污水资源化.*通讯作者,E-mail: xhuang@tsinghua.edu.cn |
|
Reference: |
|
[1]宋新新, 林甲, 刘杰, 等. 面向未来的污水处理厂关键技术研发与工程实践专栏序言[J]. 环境科学学报, 2022,42(4):1-3. |
|